2021 started off with a large project, involving the overhaul of a 30+ year old confectionary slab cooling conveyor. The project required the replacement of the 100m long stainless steel belt, a brand new direct drive system, new support and tracking rollers throughout, along with the integration with multiple new machines downstream.
No comments yet.